Metro Fire Department
P25 Phase II System Migration
Challenge
A mid-sized metro fire department was operating an aging analog system with significant coverage gaps in newer high-rise construction and underground parking structures. The department needed a path to digital P25 Phase II without disrupting active operations.
Solution
Conducted a full coverage analysis and system audit, developed a phased migration plan, coordinated frequency licensing, and provided technical oversight through infrastructure installation and acceptance testing. Included in-building coverage assessments for 14 high-priority structures.
Outcome
Successful cutover to P25 Phase II TDMA with zero operational downtime. Coverage gaps resolved in 11 of 14 assessed structures. System accepted on schedule and within budget.